
A2: 1.Hydraulic system2.Agriculture machine 3.Constraction machine 4. Automobile5.Local distributors etc. A4: Generally it is 5-10 days if the goods are in stock. or it is 25-30 days if the goods are not in stock, it is according to quantity. A6: Full order: 30% as deposit, the balance before shipment;Small order /sample order: full payment in advance.
🚚 India: 2–5 days | 🌍 Worldwide: 7–14 days air / 25–35 days sea
| US$1.00 | 100 Pieces(MOQ) |
| Customization: | Available |
| Type: | Crawler Excavator |
| Usage: | Special Excavator, GM Excavator |